Healthcare · CAT6 + Fibre
Live medical practice CAT6 + fibre installation
Cabled every consulting room and added a fibre uplink to the MDF without dropping a single appointment. Out-of-hours scheduling kept clinics running.
- Completed
- Completed October 2025
- Duration
- 2 weeks
- Scale
- 1 site · 18 consulting rooms · 4 floors
The challenge
Wharfside Medical Centre couldn't close for refit — a working week of lost appointments would cost more than the cabling. The practice needed CAT6 to every consulting room, a fibre uplink to the MDF, and zero disruption to live clinics. The existing CAT5e was 12 years old and dropping packets during teleconsultation calls.
The solution
We worked weekday evenings 6pm–10pm and full weekends, two engineers on site at a time. Each consulting room was cabled in a single evening session — clean, dressed, certified, ready for use the next morning. The fibre uplink was pulled overnight on a Saturday so Monday morning's surgery opened on the new infrastructure.
Outcomes
- Zero appointments cancelled or delayed during the install
- Teleconsultation packet loss eliminated — call quality consistently 1080p
- Practice's first ever CQC audit pass on IT infrastructure documentation
- 25-year warranty on every link